Cooling tower
MVG 47
MODULAR COOLING TOWERS MVG 47
NAME OF COOLING TOWER | MVG 47 | 2MVG 47 | |
---|---|---|---|
OPERATION CONDITIONS | |||
PERFORMANCE RANGE OF COOLING TOWER ON WATER | М3/H | 50-100 | 50-200 |
NOMINAL PERFORMANCE COOLING OF TOWER ON WATER | М3/H | 70-90 | 140-180 |
MAXIMUM TEMPERATURE OF THE HEATED WATER AT THE COOLING TOWER INPUT | °С | NO MORE THAN 65 | NO MORE THAN 65 |
DROPLET ENTRAINMENT | % | 0.007 | 0.007 |
EVAPORATION LOSSES AT DT =10°C AND AIR TEMPERATURE OF 28-30 °С | % | 1.5 | 1.5 |
PRESSURE OF DISCHARGE PIPE AT THE BASE OF COOLING TOWER | MCE | 4÷5 | 4÷5 |
COOLING TOWER CONSTRUCTION | |||
COOLING TOWER TYPE | CONTER-FLOW EXHAUST | ||
NUMBER OF SECTIONS | PCS. | 1 | 2 |
COOLING TOWER DIMENSIONS | М | 2,40 Х 2,70 | 2,40 Х 5,40 |
SECTION DIMENSIONS | М | 2,40 Х 2,70 | 2,40 Х 2,70 |
HEIGHT OF WATER INLET WITHOUT PALLET/ CONSIDERING PALLET | М | 2,463/2,883 | 2,463/2,883 |
OVERALL HEIGHT OF COOLING TOWER WITHOUT PALLET/ CONSIDERING PALLET | М | 3,813/4,233 | 3,813/4,233 |
NUMBER OF CLAMPING SHOULDERS OF WATER INLET | MM | 1 X 150 | 2 X 150 |
IRRIGATION AREA | М2 | 6.48 | 12.96 |
FAN INSTALLATION | |||
NUMBER OF FANS | PCS. | 1 | 2 |
INSTALLATION TYPE | AXIAL | ||
CONNECTION TYPE OF MOTOR AND FAN | DIRECT DRIVE | ||
FAN DIAMETER | MM | 1500 | 1500 |
ROTATION RATE | R/MIN. | 750 | 750 |
NOMINAL POWER OF ELECTROMOTOR | kW | 1 Х 7,5 | 2 Х 7,5 |
ELECTROMOTOR PARAMETERS | 380/3/50 | 380/3/50 | |
ELECTROMOTOR PROTECTION | IP55, F | IP55, F |
Component | Material |
---|---|
Body | Hot dipped galvanized steel |
Fan stack | FRP |
Casing | FRP |
Fill | PVC / PP (upon request) |
Drift eliminator | PVC / PP (upon request) |
Pipes | FRP |
Nozzles | PP / ABS (upon request) |
Air guides | PP / Galvanized steel |
Fan instalation | PAG (blades), AI (hub) |
Fan support | Hot dipped galvanized steel |
Connecting elements | Cink Steel |
Water tray | FRP |
Fan protection | Cink Steel |
Motor housing | Color coated steel |
- Low running costs
- Minimum maintenance requirements
- A wide range of components to best meet the customer's requirements
- Compact size for saving equipment cooling space
- Optimal weight for positioning on covered buildings
- The shortest possible installation and commissioning time
- Container transportation
Cooling towers | Hydraulic load m3/h. | LxWxH, mm. | Motor kW | Ventilator mm. | Inlet branch pipe mm. |
---|---|---|---|---|---|
MVG-44 | 45-85 | 2400х2400х3550 | 5,5 | 1.500 | 150 |
MVG-47 | 50-100 | 2700х2400х3550 | 7,5 | 1.500 | 150 |
MVG-77 | 60-110 | 2700х2700х4190 | 7.5 | 1500 | 150 |
2MVG-44 | 45-170 | 4800х2400х3550 | 5,5х2 | 1.500х2 | 150х2 |
2MVG-47 | 50-200 | 5400х2400х3550 | 7,5х2 | 1500х2 | 150х2 |
3MVG-44 | 45-255 | 7200х2400х3550 | 5,5х3 | 1.500х3 | 150х3 |
3MVG-47 | 50-300 | 8100х2400х3550 | 7,5х3 | 1.500х3 | 150х3 |
1
Technical request
Output document for the design and construction of water cycle .
2
Equipment selection
Customized selection of all cooling tower components that meet international standards.
3
Supply of cooling towers
Own production allows for delivery and service of cooling towers in a short time.
4
Installation supervision
Organizational and technical management of the supply and installation of cooling towers , which eliminates all risks during commissioning of equipment.
5
Exploitation
Commissioning of work. Trouble-free and safe start-up of equipment (fan cooling towers) and commissioning.
6
Acceptance of works
Signing of the act of transfer and acceptance of works, which fixes the actual performance of construction and installation works at the construction site.
7
Successful project
The project for the organization of the VOC was completed in full at a given time, within a budget that fully meets the expectations of the investor.