Cooling tower
MVG 77
MODULAR COOLING TOWERS MVG 77
Cooling tower | MVG-77 | 2MVG-77 | |
---|---|---|---|
PERFORMANCE RANGE OF THE COOLNG TOWER ON WATER | M3/HOUR | 60-110 | 60-220 |
NOMINAL PERFORMANCE RANGE OF THE COOLNG TOWER ON WATER | M3/HOUR | 80-100 | 160-200 |
MAXIMUM TEMPERATURE OF HEATED WATER ON THE INPUT OF THE COOLING TOWER | °С | NOT MORE THAN 65 | NOT MORE THAN 65 |
DROPLET ENTRAINMENT | % | 0.007 | 0.007 |
EVAPORATION LOSSES AT DT =10°C AND AIR TEMTERATURE 28-30 °С | % | 1.5 | 1.5 |
PRESSURE IN A DISCHARGE PIPE AT THE BASE OF THE COOLING TOWER | МCE | 4÷5 | 4÷5 |
TYPE OF THE COOLING TOWER | CONTER-FLOW EXHAUST | ||
NUMBER OF SECTIONS | PIECE | 1 | 2 |
DIMENTIONS OF COOLING TOWER | m | 2,70 х 2,70 | 2,70 х 5,40 |
DIMENTIONS OF SECTION | m | 2,70 х 2,70 | 2,70 х 2,70 |
HEIGHT OF WATER INLET WITHOUT PALLET / TAKING INTO ACCOUNT THE PALLET | m | 2,260/2,680 | 2,260/2,680 |
OVERALL HEIGHT OF COOLING TOWER INLET WITHOUT PALLET / TAKING INTO ACCOUNT THE PALLET | m | 3,560/3,980 | 3,560/3,980 |
NUMBER OF CLAMPING SHOULDERS OF WATER INLET | mm | 1 x 150 | 2 x 150 |
IRRIGATION AREA | m2 | 7.29 | 14.58 |
NUMBER OF FANS | PIECE. | 1 | 2 |
INSTALLATION TYPE | AXIAL | ||
CONNECTION TYPE OF MOTOR AND FAN | DIRECT DRIVE | ||
FAN DIAMETER | mm | 1500 | 1500 |
ROTATION RATE | R/MIN. | 750 | 750 |
NOMINAL POWER OF ELECTROMOTOR | kW | 1 х 7.5 | 2 х 7.5 |
ELECTROMOTOR PARAMETERS | 380/3/50 | 380/3/50 | |
ELECTROMOTOR PROTECTION | IP55, F | IP55, F |
Component | Material |
---|---|
Body | Hot dipped galvanized steel |
Fan stack | FRP |
Casing | FRP |
Fill | PVC / PP (upon request) |
Drift eliminator | PVC / PP (upon request) |
Pipes | FRP |
Nozzles | PP / ABS (upon request) |
Air guides | PP / Galvanized steel |
Fan instalation | PAG (blades), AI (hub) |
Fan support | Hot dipped galvanized steel |
Connecting elements | Cink Steel |
Water tray | FRP |
Fan protection | Cink Steel |
Motor housing | Color coated steel |
- Low running costs
- Minimum maintenance requirements
- A wide range of components to best meet the customer's requirements
- Compact size for saving equipment cooling space
- Optimal weight for positioning on covered buildings
- The shortest possible installation and commissioning time
- Container transportation
Cooling towers | Hydraulic load m3/h. | LxWxH, mm. | Motor kW | Ventilator mm. | Inlet branch pipe mm. |
---|---|---|---|---|---|
MVG-44 | 45-85 | 2400х2400х3550 | 5,5 | 1.500 | 150 |
MVG-47 | 50-100 | 2700х2400х3550 | 7,5 | 1.500 | 150 |
MVG-77 | 60-110 | 2700х2700х4190 | 7.5 | 1500 | 150 |
2MVG-44 | 45-170 | 4800х2400х3550 | 5,5х2 | 1.500х2 | 150х2 |
2MVG-47 | 50-200 | 5400х2400х3550 | 7,5х2 | 1500х2 | 150х2 |
3MVG-44 | 45-255 | 7200х2400х3550 | 5,5х3 | 1.500х3 | 150х3 |
3MVG-47 | 50-300 | 8100х2400х3550 | 7,5х3 | 1.500х3 | 150х3 |
1
Technical request
Output document for the design and construction of water cycle .
2
Equipment selection
Customized selection of all cooling tower components that meet international standards.
3
Supply of cooling towers
Own production allows for delivery and service of cooling towers in a short time.
4
Installation supervision
Organizational and technical management of the supply and installation of cooling towers , which eliminates all risks during commissioning of equipment.
5
Exploitation
Commissioning of work. Trouble-free and safe start-up of equipment (fan cooling towers) and commissioning.
6
Acceptance of works
Signing of the act of transfer and acceptance of works, which fixes the actual performance of construction and installation works at the construction site.
7
Successful project
The project for the organization of the VOC was completed in full at a given time, within a budget that fully meets the expectations of the investor.