Cooling tower
MVG 77

MODULAR COOLING TOWERS MVG 77



Cooling tower | MVG-77 | 2MVG-77 | |
---|---|---|---|
PERFORMANCE RANGE OF THE COOLNG TOWER ON WATER | M3/HOUR | 60-110 | 60-220 |
NOMINAL PERFORMANCE RANGE OF THE COOLNG TOWER ON WATER | M3/HOUR | 80-100 | 160-200 |
MAXIMUM TEMPERATURE OF HEATED WATER ON THE INPUT OF THE COOLING TOWER | °С | NOT MORE THAN 65 | NOT MORE THAN 65 |
DROPLET ENTRAINMENT | % | 0.007 | 0.007 |
EVAPORATION LOSSES AT DT =10°C AND AIR TEMTERATURE 28-30 °С | % | 1.5 | 1.5 |
PRESSURE IN A DISCHARGE PIPE AT THE BASE OF THE COOLING TOWER | МCE | 4÷5 | 4÷5 |
TYPE OF THE COOLING TOWER | CONTER-FLOW EXHAUST | ||
NUMBER OF SECTIONS | PIECE | 1 | 2 |
DIMENTIONS OF COOLING TOWER | m | 2,70 х 2,70 | 2,70 х 5,40 |
DIMENTIONS OF SECTION | m | 2,70 х 2,70 | 2,70 х 2,70 |
HEIGHT OF WATER INLET WITHOUT PALLET / TAKING INTO ACCOUNT THE PALLET | m | 2,260/2,680 | 2,260/2,680 |
OVERALL HEIGHT OF COOLING TOWER INLET WITHOUT PALLET / TAKING INTO ACCOUNT THE PALLET | m | 3,560/3,980 | 3,560/3,980 |
NUMBER OF CLAMPING SHOULDERS OF WATER INLET | mm | 1 x 150 | 2 x 150 |
IRRIGATION AREA | m2 | 7.29 | 14.58 |
NUMBER OF FANS | PIECE. | 1 | 2 |
INSTALLATION TYPE | AXIAL | ||
CONNECTION TYPE OF MOTOR AND FAN | DIRECT DRIVE | ||
FAN DIAMETER | mm | 1500 | 1500 |
ROTATION RATE | R/MIN. | 750 | 750 |
NOMINAL POWER OF ELECTROMOTOR | kW | 1 х 7.5 | 2 х 7.5 |
ELECTROMOTOR PARAMETERS | 380/3/50 | 380/3/50 | |
ELECTROMOTOR PROTECTION | IP55, F | IP55, F |
Component | Material |
---|---|
Body | Hot dipped galvanized steel |
Fan stack | FRP |
Casing | FRP |
Fill | PVC / PP (upon request) |
Drift eliminator | PVC / PP (upon request) |
Pipes | FRP |
Nozzles | PP / ABS (upon request) |
Air guides | PP / Galvanized steel |
Fan instalation | PAG (blades), AI (hub) |
Fan support | Hot dipped galvanized steel |
Connecting elements | Cink Steel |
Water tray | FRP |
Fan protection | Cink Steel |
Motor housing | Color coated steel |
- Low running costs
- Minimum maintenance requirements
- A wide range of components to best meet the customer's requirements
- Compact size for saving equipment cooling space
- Optimal weight for positioning on covered buildings
- The shortest possible installation and commissioning time
- Container transportation
Cooling towers | Hydraulic load m3/h. | LxWxH, mm. | Motor kW | Ventilator mm. | Inlet branch pipe mm. |
---|---|---|---|---|---|
MVG-44 | 45-85 | 2400х2400х3550 | 5,5 | 1.500 | 150 |
MVG-47 | 50-100 | 2700х2400х3550 | 7,5 | 1.500 | 150 |
MVG-77 | 60-110 | 2700х2700х4190 | 7.5 | 1500 | 150 |
2MVG-44 | 45-170 | 4800х2400х3550 | 5,5х2 | 1.500х2 | 150х2 |
2MVG-47 | 50-200 | 5400х2400х3550 | 7,5х2 | 1500х2 | 150х2 |
3MVG-44 | 45-255 | 7200х2400х3550 | 5,5х3 | 1.500х3 | 150х3 |
3MVG-47 | 50-300 | 8100х2400х3550 | 7,5х3 | 1.500х3 | 150х3 |

Technical request
Output document for the design and construction of water cycle .

Equipment selection
Customized selection of all cooling tower components that meet international standards.

Supply of cooling towers
Own production allows for delivery and service of cooling towers in a short time.

Installation supervision
Organizational and technical management of the supply and installation of cooling towers , which eliminates all risks during commissioning of equipment.

Exploitation
Commissioning of work. Trouble-free and safe start-up of equipment (fan cooling towers) and commissioning.

Acceptance of works
Signing of the act of transfer and acceptance of works, which fixes the actual performance of construction and installation works at the construction site.

Successful project
The project for the organization of the VOC was completed in full at a given time, within a budget that fully meets the expectations of the investor.